Re: Wrong Calculation in Scrap % field in CO02.

$
0
0

Hello Dinesh,

 

If this is correctly defined in the material master MRP1,  the total quantity should be the quantity before scrapping.

In your case if you want to produce 100 kg, production order should start with total quantity of 110 kg

 

Scrap percentage = scrap portion / (Total quantity - scrap portion) %

 

Example:

 

Total quantity      Scrap portion    Scrap percentage

     50                         10                         25.00 %

     100                       10                         11.11 %

     110                       10                         10.00 %

 

Regards