Hi Guys,
I need help on below scenario,
we have below setup,
OS : Linux
DB : Oracle (1.5 TB DB size)
system landscape(R3) : ECC6.0 ehp5
we are planning to upgrade Ecc6.0 ehp5 to ECC 6.0 EHP7.
In above scenario,
1. How to start the setup including Steps ?
2. How much time is required for upgrade Ecc6.0 ehp5 to ECC 6.0 EHP7 (How much time/how many days is required)?
3. upgradation steps from Ecc6.0 ehp5 to ECC 6.0 EHP7 ?
Please let me know how much time(Estimation Time) will it take for above system landscape including Dev,QA and Prod ?
Thanks,
Rameessh