i all,
I have an interface for IDOC to FTP(file) scenario.
In production the messages for this interface are getting stuck in "TO BE DELIVERED" status.
Can anyone please tell me how I can reproduce this scenario in the test system so that the messages can stay in TO BE DELIVERED status?