Hi
I was wondering why SAP assigned the same name to two fields, - one in Material Master and another in Schedule line category(VOV6) .Are they same?
If not what is the function of the 2nd "item category" in Schedule line Category?
Thanks & Regards
Hi
I was wondering why SAP assigned the same name to two fields, - one in Material Master and another in Schedule line category(VOV6) .Are they same?
If not what is the function of the 2nd "item category" in Schedule line Category?
Thanks & Regards